| Network Resource can facilitate your
move in a timely and cost efficient way. We manage all facets
of the relocation of your computer equipment and telecommunication
circuits. This ensures a smooth transition of your network to
your new location.
To ensure successful relocation, we appoint an Account Manager,
Lead Relocation Engineer and a Secondary Relocation Engineer.
A site assessment will be conducted of your existing and new
locations. Based on this assessment, an Action Item List will
be created by Network Resource detailing each step of the move.
Once dates have been finalized, your lead engineer will arrive
at your site to backup your network, down the network, box equipment,
load truck, reinstall equipment, test, and be on-site to provide
support when the site goes live.
The Five Steps to a Successful Relocation:
Analysis
Your lead engineer meets with your organization to analyze the
current system to determine your needs, and visit the new site.
Planning
The lead engineer will create a detailed plan and timeline of
what needs to be done when and by whom. We can coordinate the
purchase or relocation of your telephone system, coordinate
the voice and data wiring of your new space, including the selection
and ordering of all telephone and Internet services. We will
create a detailed time and cost budget for all work. With a
solid plan, you will have a clear sense that everything is structured
and that any difficulties will be addressed. If included, our
scope of work can encompass supervising the telephone companies,
telephone system installers and cabling contractors to ensure
that everything is installed according to plan.
Moving
Our staff of technicians will monitor the move by making sure
equipment is properly staged, packed, labeled, moved and reinstalled
properly.
Testing
All network equipment will be set up and tested by certified
Network Resource technicians to ensure all systems are configured
and working properly before your first day of operation. If
a significant problem develops we will come up with an alternate
plan to ensure that you are functional.
Going Live
Your lead engineer will remain on site for as long as necessary
to ensure a smooth transition and to quickly resolve any problems
that may arise after the move.
We have moved a myriad of companies and have never been the
cause of a move delay. In certain instances we have worked around
the clock, but come the first day of business, our client’s
networks are functioning smoothly and without incident.
Benefits
- This frees up your company’s staff –moving
arrangements made by Network Resource
- Network Resource engineers are trained and certified to
work with your equipment
- Network Resource can provide a fixed cost estimate for the
move
- Network Resource ensures the protection and integrity of
your data by completely backing up your network prior to the
moving a single piece of equipment
- Network Resource fully documents and diagrams your network
as a reference and starting point for future maintenance
Why relocate with Network Resource?
Our objective is to provide your employees with a productive
working environment following the office move. Using Network
Resource rather than a moving company or existing employees
ensures a smooth transition between the two locations. This
guarantees the proper dismantling, safe handling and installation
of your computer equipment from existing to new location.
Contact
Network Resource for a FREE network consultation
|